Page 9 - Combined_81_OCR
P. 9
ENGINE COOLING WIND TUNNEL 6.
I
PROPOSED WIND TUNNEL (Continued)
e
Uti1i ties (Continued)
Water, air, and oil fuel supplies shall be connected into the
Impact Building systems.
Indolene (standard Tab. gasoline) supply to test cars shall be
from a new tank to be situated outside the security fence east
of the Impact Building.
Site ; ’
The size of the- site is expected to be approximately 200' X 250
Access to the site shall be by roadway south of Impact Building
Parking shal1 be provided for eight cars on the north side of
the 1 oadway. The Wind Tunnel shall be south of the roadway
and set back approximately 85'.
The area between the Wind Tunnel and the roadway and for a
distance of approximately 20* around the Wind Tunnel shall be
graded and landscaped.
Wind Tunnel Layout
. f
The entrance of the Wind Tunnel shall be by pedestrian door
off the driveway, leading directly into the support area.
Access to the office, washroom and storage space shall be
from the support area.
The office shall hold three desks and associated office equip
ment and shall be air conditioned. The washroom facilities
shall be available for men only.