Page 6 - Combined_81_OCR
P. 6
ENGINE COOLING WIND TUNNEL 3-
DESCRIPTION OF WORK (Continued)
Wind Tunnel Concept C o (Continued)
II O
This tunnel may be built for engine cooling systems and/or
under hood and body temperature acquisition and/or aerodynamic
testing. The tunnel may consist of a singl D C return passage
complete with fan and two test sections, one as Concept "A"
and the other L U co Concept CD Only one test section would be
operable at any one time.
NOTE: It should be recognized that within the scope of these
three concepts othe u (U ternates may be feasible.
Final Engineering Requirements
After one of these concepts is selected by Chrysler Corporation,
the design and construction of the Wind Tunnel and supporting
facilities at the Chelsea Proving Grounds, Chelsea, Michigan
for Chrysler Corporation shall entail the following tasks:
Provide technical consultation and studies of Wind Tunnel
equipment, loads, environmental control, design, construc
tion and overall detail planning as required during the
design phase of the project.
b) Design, prepare bid documents and drawings for new Wind
Tunnel including all architectural, mechanical and "elec
trical work and services.