ENGINE COOLING WIND TUNNEL                                                                   4.




                   DESCRIPTION OF WORK (Continued)
             CXI
                   Fino * ngineering Requirements (Continued)


                    O    Design and prepare bid documents and drawings for special
                         supporting services and installations which require func-
                                                                                                   i
                         tional integration with the new Wind Tunnel including gaso­

                         line services, fire protection systems, engine exhaust

                         systems, make-up air systems, simulated solar load, data


                         acquisition system, facility control and communication
                         systems, roll type dynamometer installations and other


                         miscellaneous items.


                   d) Provide for inspection and reports of construction and

                         review and approval of shop drawings during construction.

                         Inspection and report shall consist of weekly or more

                         frequent (if required) inspection of the installation

                         during construction with a written report submitted to

                         the Owner after each inspection affirming agreement with
                                                                        I                                 •
                         design objectives.



                    0    Provide personnel to direct the contractor during starting

                         and operating the facility initially, performing acceptance

                         tests of the facility and systems, making all necessary

                        adjustments and corrections and training Chrysler personnel

                         in the operation and maintenance of the facility. Owner­

                        acceptance of the facility shall require a complete satis-
                                                                                                 u
                        factory operation of all systems for a period of 72 hours.