Page 4 - Combined_81_OCR
P. 4

OWNER'S REQUIREMENTS AND DESIGN CRITERIA

                                        ENGINE COOLING WIND TUNNEL




               1• GENERAL

                     Owner's requirements and design criteria compiled in this

                     document prescribe tentative requirements for the design

                    and construction of an Engine Cooling Wind Tunnel to be

                     located at the Chelsea Proving Grounds, approximately three

                    miles south of Chelsea, Michigan, Sylvan Township County

                    of Washtenaw.


                    Requirements and design criteria for the facility are not
                                        «
                     intended to restrict the design by the design agency, but
                    only to summarize desirable features from Chrysler's pre­


                    vious experience and studies of the project.


                    Changes to improve operating efficiency or economy of con­

                    struction, concept, etc., affecting Owner's requirements

                    shall be reviewed and approved by Chrysler to assure com-

                       lance with Owner's requirements.
                    CL



               hJ   e  DESCRIPTION OF WORK

                    Introduction

                    A Wind Tunnel, complete with supporting area and associated

                    equipment is required to meet the immediate needs of testing

                    whole car mounted automobile radiators and engine cooling com­

                    ponents. Recognizing that there might be some advantages to

                    constructing a multi               use facility, a Preliminary Engineer-

                    ing Study of Engine Cooling/Aerodynamic Testing Wind Tunnels

                    shal1 be required.
   1   2   3   4   5   6   7   8   9