Page 11 - Combined_81_OCR
P. 11

ENGINE COOLING WIND TUNNEL                                                                   8




                    PROPOSED WIND TUNNEL (Continued)

                   Wind Tunnel Layout (Continued)



                    The Control Room shall have a floor to ceiling bullet proof

                      ass wall facing the test section to permit observations of

                   air flow patterns above and below the vehicle.


                   The data acquisition system, print out, controls and tunnel

                   control console shall all be situated in the Control Room.

                   The room shall be air conditioned.



                   Venti1ati on

                   The car preparation area shall have a general heating system

                   with a door heater situated at the overhead door. The indi­

                    vidual rooms within the support area may be fitted with unit

                   heaters.


                   The tunnel test section shall be fitted with a unit heater to


                   provide comfort heat during the installation of a car.


                    Idle/City Traffic Test Room

                   The Idle/City Traffic Test Room shall be handled under a future

                   proj ect.




             4.    OVERALL ACCURACY

                   The control and readings of the tunnel characteristics over

                   the range indicated shall be such that the cumulative effects

                   of the deviations in these variables from set point shall have

                   an effect on the radiator heat transfer correlation of less than


                   1%.

                                                                                                            1
   6   7   8   9   10   11   12   13   14   15   16