facility. Test section size, physical and effective, will be given. Also,
tunnel turbulence level and blockag ( 0 4 atio will be determined for each
installation.
Utility of the tunnel will be of prime concern. It would be desirous
that^bhoy-have conducted automobile tests in the past. The tunnel must C T D C
adaptable to a ground plane. For full scale testing it would be desirous
to have a dynamometer arrangement in the test section. Sufficient instru
mentation must be available to assure successful test data. The data
collection apparatus should C T c d o
and yielding data in coefficient form, in a short pe iod of time. All the
above information will be presented in tabular form in handbook fashion to
aid in facility selection. For increased data validity, it is desirous that
experimental data be obtained in more than one facility. For this reason
several facilities may be selected in which tests will be conducted. To help
resolve any scale effects, several different size models may be investigated
(i. , full-scale, 3/8 scale). Before final selection of a facility or facilitie
is made, personal inspection of the candidate tunnel(s) should be made and
the the tests discussed with tunnel personnel to insurej/mutual agreements
on test items.
3. Test Planning and Model Design: Test planning will require
•gomrrinput and guidance from Central Engineering personnel since a complet Q
gamjlt of parameters could be covered during a test or a series of tests.