3


                 facility. Test section size, physical and effective, will be given. Also,

                 tunnel turbulence level and blockag        ( 0  4  atio will be determined for each


                 installation.

                          Utility of the tunnel will be of prime concern. It would be desirous


                 that^bhoy-have conducted automobile tests in the past. The tunnel must                  C T  D  C

                 adaptable to a ground plane. For full scale testing it would be desirous


                 to have a dynamometer arrangement in the test section. Sufficient instru­

                 mentation must be available to assure successful test data. The data

                 collection apparatus should        C T    c d  o


                 and yielding data in coefficient form, in a short pe          iod of time.     All the

                 above information will be presented in tabular form in handbook fashion to


                 aid in facility selection. For increased data validity, it is desirous that

                 experimental data be obtained in more than one facility. For this reason


                 several facilities may be selected in which tests will be conducted. To help

                 resolve any scale effects, several different size models may be investigated


                 (i.   , full-scale, 3/8 scale). Before final selection of a facility or facilitie

                 is made, personal inspection of the candidate tunnel(s) should be made and

                 the the tests discussed with tunnel personnel to insurej/mutual agreements


                 on test items.

                          3.     Test Planning and Model Design: Test planning will require


                •gomrrinput and guidance from Central Engineering personnel since a complet  Q

                 gamjlt of parameters could be covered during a test or a series of tests.