J. E. Vaughn
DRAFT Dept. 4831
3-1-68
PROPOSED PROGRAM APPROACH
1. Guidlines and Assumptions: It is the intent of CHO to offe hi
a complete program, one which will require a minimum amount of super-
th greatest gam. The proposed scop of work is therefore div ided into
several areas of endeavor which H i epresents milestones of progress. At the
conclusion of each work phase, meetings w£>uHbe held between CHO and
CE to eview progress and ensure agreement on future work plans. CHO
would be responsible for all phases of the program from the initial study
effort through model design, model fabrication, test conductwa and final
report formulation. Tunnel arrangements and any subcontracting would -S
b e j handled ■ by CHO.
2. Definition Study: In order to insure that the most information
will be gained from this program, it is proposed that initially several
studies be conducted. First, many dollars can be saved in wind tunnel testing
through a thorough search of literature to determine the pre ent state-of-
the-art. CHO has access to Redstone Scientific Information Center (RSIC),
one of the la 4 ge C D c-t- technical libraries to be found in thi I D n ountry. Through
it, access can be gained to Defense Documentation Center (DDC), Scientifi 0
T echnical Abstract Review (STAR) and other large governmental agencie C D
which spe ialize in scientific information services. Computer searches will
o
f t
be performed to obtain pertinent information these agencies havezcovering