H. P. Bruns                                 - 2 -                            April 8, 1970

                                       I
                        2. Instrumentation and Electronics Support


                               a.    Test Support - Grand National Cars

                                     The Dodge Daytona was instrumented for Atlanta tests and data was
                  recorded and reduced in support of track tests. The prop shaft torque measuring
                  system functioned until the prop shaft failed mechanically and destroyed the unit.
                                    ■ 1
                                     The Plymough was instrumented in preparation for Talladega tests
                  including engine and suspension system measurements.

                               b.    Test Support - Trans Am Cars

                                     A secondary measurement system was prepared for Trans Am
                  division Barracuda tests using a borrowed 6 channel Brush recorder with a 110 V
                  inverter power supply plus transducer power supply and signal conditioning equipment
                  (system wt. 200 lbs).

                                     The system was transported to AAR in California and installed for
                  tests. Due to engine problems with vehicle, no instrumentation test runs were per­
                  formed during March. The system was left in the vehicle for operation when mech­
                  anical problems are solved.


                               c. Communication System


                                     The pit to driver communication system was        installed in the Owens/
                  Baker Dodge and used during Rockingham and Atlanta races,           No problems wer o
                  encountered with the system.

                                     Efforts to procure 450 me band portables were stopped due to
                  funding limitations. Quotes have been received from GE on 2 watt units and
                  motorola on 4 watt units.

                        3. Mobile Control Center


                               The Control Center was located at Rockingham during pre race activities
                  and prepared for scoring the race.


                               An attempt was made to score the race using available Detroit engineering
                  personnel at the track. No computer personnel from Huntsville were on hand due to
                  a cost reduction program.