B.     OBJECTIVES


                      The objectives of this program are to plan and organize a test program

               to perform automotive aerodynamic testing of vehicle exterior components and


                tn  hapes including external and internal cooling system configurations. The test5>

               will be supervised in a wind tunnel facility selected on a competitive compari-

               son basis. The test        rogram results will      U   D  C  D  C  valuated and organiz  T5  mto an


               illustrated and simplified handbook typ          report which may be used by non-tech-

                 * - * •  O  P  tyling personnel during the early phases of vehicle planning.


                      1.     Study:     The study phase objective will be to review and           u ompar

               available wind tunnel facilities, instrumentation techniques, models, etc. , and


               compare for cost, accuracy, availability, etc. , and select a mutually suitable

               site or sites and prepare a users agreement.

                      Existing wind tunnel facilitie       u apable of testing 3/8 and full scale auto-


               mobile models will be evaluated to determine availability, accuracy, cost, etc. ,

               in order to select tunnel or tunnel      tn  tn  uitable for aerodynamic testing. The


               objective   • r — 4  a  tn  tudy will be to select a tunnel or combination of tunnels fo

               testing which can give the most accurate information required at the lowest


               overall cost.

                      Instrumentation systems and techniques used by the various facilities will

               be analyzed and evaluated as part of the total study.


                      2.     Model Design:        Existing models will be analyzed to determine the

               most suitable way     tn  of modifying elements for quick change or segmented com-


               ponents to reduce tunnel down time for model configuration changes.