Page 1 - Combined_67_OCR
P. 1
INTER COMPANY CORRESPONDENCE
FILE DATE
CODE March 6, 1968
TO - NAME DEPT. DIVISION PLANT/OFFICE
H. Bader, Jr. S&M Engineering Space Huntsville
FROM - NAME DEPT. DIVISION PLANT/OFFICE
W. P. Wright S&M Engineering Space Huntsville
SUBJECT:
Trip Report to Detroit March 4 and 5, 1968.
The writer visited Highland Park Central Engineering Monday
afternoon and met with Mr. F. Deaty in the Air Conditioning Laborato 4
to discuss the "Rapid Heat" problem. Mr. Deaty reviewed the 4 equire-
ment to obtain 100°F heater blower air within two minutes from start up cCT F
and utiliz D C
no promising olutions on the horizon, but that the problem would get
increasing emphasis because it is the weakest area of the automobile
(passenger warm up or omfort). Mr. Deaty reviewed a memo from
R. D. MacDiarmid to W. P. Wright which reflected our views on the
various approaches and he generally agreed with the conclusicns reached.
He was particularly interested in seeing more on our idea for direct
immersion heat exchangers and a true catalytic heater. This information
will be collected and forwarded.
Later a meeting was held with Mr. M. Dawley to review our propos C D CL
work scop D C for an aerodynamic test program and discuss participation in
a race car wind tunnel test program.
Their were few direct comments on our propo tn al draft since it
basically played back their thinking. Some points we were asked to
mphasize more,such as analysis cf tunnel correction factors and con-
ideration of a base model fo 0) T) tablishing run standards and ompanng
different facilities.
84- 1 10-7879 REV. 1-63