H. P. Bruns - 3 - September 9, 1970
d. Printed Circuit Board Signal Conditioning System:
The power supply and signal conditioning system are beginning
final stages of assembly and should be ready for a functional
checkout in 4 to 6 weeks.
e. Water Puppy Thermal and Flow Test:
A Jabsco pump was tested in a simulated automatic transmission
dry sump system with fluid temperatures to 300°+F.
Oil Tank Level Measuring System:
An engine oil sump tank was instrumented with a float type oil
level measuring system plus a differential pressure fluid level
measurement.