H. P. Bruns                              - 3 -                       September 9, 1970



                                d.     Printed Circuit Board Signal Conditioning System:


                                      The power supply and signal conditioning system are beginning
                                      final stages of assembly and should be ready for a functional
                                       checkout in 4 to 6 weeks.


                                e.    Water Puppy Thermal and Flow Test:

                                      A Jabsco pump was tested in a simulated automatic transmission
                                      dry sump system with fluid temperatures to 300°+F.

                                       Oil Tank Level Measuring System:


                                      An engine oil sump tank was instrumented with a float type oil
                                       level measuring system plus a differential pressure fluid level
                                       measurement.









                                                                             W. P. Wright

                   WPW:ck


                   cc:    L. J. Rathgeb