Page 5 - Combined_104_OCR
P. 5
H. P. Bruns 5 March 10, 197 0
b. Continue second priority build-up of test car 046 for automatic
transmission testing. No transmissions have been received for the test vehicle
to date.
2. Instrumentation and Electronics Support '
a. Test Support
The Daytona test vehicle will be instrumented and data recorded
and reduced from Atlanta track testing,
Talladega track tests will also be supported with required
instrumentation.
A Trans Am vehicle test will be supported at Riverside
March 9-23, 1970.
Development efforts will continue on a complete printed circuit
board signal conditioning and power supply system,
b. Communication System
The existing pit-to-driver communication s m will follow
Bake 4 0) vehicle to the Rockingham 500 and Atlanta 500 races for continued 2 c n
and developinental testing.
The small, lightweight 450 MC hand-portable radio units will
be tested for use in race vehicles to replace heavier units, depending on availability
of units presently on loan from GE,
3. Mobile Control Cente
The center will be used to support and score the Rockingham 500 race
and Atlanta test activities.
Following the Atlanta test the center will return to Huntsville o
H
modifications of compute ystem and mechanical improvements for more reliable,
efficient operation.