Page 4 - Combined_24_OCR
P. 4
H..v
61201 MAR. 62. SHEET OF
WORK ORDER
CHRYSLER CORPORATION REVISION
SPACE DIVISION DEPARTMENT OFFICE- S&M DATE 12/18/68 ROUTING NO.
Special Performance Vehicle Communication System
—
COMPONENT DIRECT COST ESTIMATED DATE CHARGE
Direct Labor 55Z / /
NUMBER
NO. ( Man-Hours ) MATERIAL OTHER START FINISH
BILITY PROGRAM NO.
4800 LEAD 24 $ 2130 $ 180 1/1/69 3/15/69 (CODE) ( )
47Q0 SUPPORT 154 WORK DIR. NO.
SUPPORT CONTRACT PT. SEC. P/P F.O. T.A.D.
SUPPORT
SUPPORT
ACTION DATE
SUPPORT RECEIVED BY
COST ACCOUNTING
SUPPORT BRANCH
CHARGE NO.
SUPPORT
ASSIGNED AND
ISSUED
SUPPORT
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT
CLOSED
SUPPORT
178 s 2130 s 180
TOTALS CONTROL NO.
MONTH
Jan. Feb. Mar.
PROJECTED
WORK TOT. M. HRS. 60 80 38
LOAD DIR. LABOR
LEAD COMP.
8 16
M. HRS. D. L.
DESCRIPTION: A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Oc THE END PRODUCTS (S). IF ANY: RELEASE AND DELIVERY DATES; A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED) .
LEAD ENGINEER: W. P. Wright
Design a communication system capable of voice transmission from a high speed
competition vehicle to a nearby mobile control unit.
Fabricate an acoustic helmet with three types of acoustic microphones attached for
test and evaluation.
Purchase and assemble the necessary electronic and electrical equipment for
complete unit and bench check.
Install and functionally check out system in a vehicle under simulated competition
conditions.