I dropped by to discuss the front wheel drive proposal from an administrative
standpoint with Mr. Juk. He stated they would be looking for an overall or overview
type of proposal that would describe at least the proposed first phase plus the follow
on phase or phases for planning purposes. The detailed first phase technical would
\
be worked out between ourselves and Truck Engineering. I stated our intention to
draft the proposal and review it with them prior to a formal submission.
Mr. Knotek was visited to follow up on a request for drawings of the DTOO Tv C
front wheel axle assembly for use in our front wheel drive proposal.
I returned to engineering to review rapid heat program and sit in on a cold
room test but the air heater simulator had failed and tests were temporarily canceled.
I dropped by to see Mr. Dawley who requested that we bill him early (in July) for the
entire rapid heat phase I effort because his phase II MY-70 funds had been cut. Mr.
Dawley could not project the fate of our rapid heat effort because he is confused by
conflicting management direction (the project has a top priority rating but no funds
allocated for MY-70).
*