W. P. Wright                               - 2 -                            April 24, 1970


                           1.     Longitudinal Acceleration
                           2.     Vertical Acceleration
                                  Engine RPM
                           CO
                                  Yaw
                           TT
                                  Left Front Wheel Speed
                           LQ
                                  Propellor Shaft Torque
                           O

                                  Air Intake Pressure
                           b -
                   The torque sensor was installed by Nichols Engineering, but used signal conditioning
                   furnished by Huntsville. Also, since the torque meter had not been calibrated,
                   Huntsville was asked to calibrate the unit after tests are completed.

                           The pressure measurement is a 46 channel Scani-valve assembly installed by
                   Proving Ground engineers and recorded on the Huntsville recorder system. The scani-
                   valve was powered by four dry cell batteries; however, the voltage drop due to IR loss
                   had been causing problems with this battery system. A six volt regulated power supply
                   was furnished by Huntsville to replace the batteries. All other measuring systems are
                   Huntsville designed and developed.

                           On Saturday, 18 April, all instrumentation installation was completed and a slow
                   speed (120 mph or less) run was made. All instruments functioned properly except the
                   scani-valve.

                           On Sunday, 19 March, the high speed runs were cancelled due to rain and
                   rescheduled for Sunday, 26 April. In the interim, Central Engineering personnel will
                   attempt to repair the scani-valve. The writer returned to Huntsville. The tests have
                   been rescheduled at Chelsea, 26 April.








                                                                                H. R. Killen