          TITLE Scale Model Wind Tunnel Testing of Automobiles
             COMPONENT                        DIRECT COST            ESTIMATED DATE     CHARGE
                           Direct Labor                                                NUMBER           55169
                 RESPONSI­
            NO.            ( Man-Hours )  MATERIAL    Travel        START     FINISH
                   BILITY                                                              PROGRAM NO.
                                                                                          (CODE)                  ( )
          4800     LEAD      568 •    s             s 1741       4 '22/68   7/31/68
                                                                                       WORK DIR. NO.
                  SUPPORT                                                                                 0&03 0(0^
                  SUPPORT                                                              CONTRACT      PT.  SEC.  P./ P  F.O.  T.A.D.
                  SUPPORT
                  SUPPORT
                                                                                                             DATE
                  SUPPORT                                                              RECEIVED BY
                                                                                       COST ACCOUNTING
                  SUPPORT                                                              BRANCH
                                                                                       CHARGE NO.
                  SUPPORT
                                                                                       ASSIGNED AND
                                                                                       ISSUED
                  SUPPORT
                                                                                       SENT TO DATA
                  SUPPORT                                                              PROCESSING
                                                                                       DEPT.
                  SUPPORT
                                                                                       CLOSED
                  SUPPORT
             TOTALS          568      s            s 1741                              CONTROL NO.
                         MONTH
                                   Apr    May June July
           PROJECTED
             WORK      TOT. M. HRS.
             LOAD      DIR. LABOR  56      168    168    176                                                       568
                       LEAD COMP.
                                   56      168    168    176
                       M. HRS. D. L.
          DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
          SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
                 (WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Oc THE END PRODUCTS (S), IF ANY; RELEASE' AND DELIVERY DATES; A BRIEF DE­
                  SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
                  DESCRIPTION OF THE WORK INVOLVED) .
                      PROJECT ENGINEER: W. P. Wright                        LEAD ENGINEER: J. E. Vaughn

            Pr  ovid  D  C  >  erodynamic Support to the Fluid Mechanics and Aerodynamics Laboratory
            of  the Eng ineering Office in Highland Park in the following technical areas:


                    1. Test Planning 3/8 scale testing

                           Model configuration


                           Model fabrication coordination

                           Wind Tunnel mte face coordination


                           Test Conduction

                           Data Analysi
   1   2   3