TITLE Scale Model Wind Tunnel Testing of Automobiles
COMPONENT DIRECT COST ESTIMATED DATE CHARGE
Direct Labor NUMBER 55169
RESPONSI
NO. ( Man-Hours ) MATERIAL Travel START FINISH
BILITY PROGRAM NO.
(CODE) ( )
4800 LEAD 568 • s s 1741 4 '22/68 7/31/68
WORK DIR. NO.
SUPPORT 0&03 0(0^
SUPPORT CONTRACT PT. SEC. P./ P F.O. T.A.D.
SUPPORT
SUPPORT
DATE
SUPPORT RECEIVED BY
COST ACCOUNTING
SUPPORT BRANCH
CHARGE NO.
SUPPORT
ASSIGNED AND
ISSUED
SUPPORT
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT
CLOSED
SUPPORT
TOTALS 568 s s 1741 CONTROL NO.
MONTH
Apr May June July
PROJECTED
WORK TOT. M. HRS.
LOAD DIR. LABOR 56 168 168 176 568
LEAD COMP.
56 168 168 176
M. HRS. D. L.
DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Oc THE END PRODUCTS (S), IF ANY; RELEASE' AND DELIVERY DATES; A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED) .
PROJECT ENGINEER: W. P. Wright LEAD ENGINEER: J. E. Vaughn
Pr ovid D C > erodynamic Support to the Fluid Mechanics and Aerodynamics Laboratory
of the Eng ineering Office in Highland Park in the following technical areas:
1. Test Planning 3/8 scale testing
Model configuration
Model fabrication coordination
Wind Tunnel mte face coordination
Test Conduction
Data Analysi