Page 5 - Combined_113_OCR
P. 5
SPACE DIVISION CHRYSLER
\ /\./ corporation
‘UNTSVILLE OPERATIONS
April 3, 1969
Chrysler Corporation
Air Conditioning and Aerodynamics Lab
Central Engineering - Highland Park
P. O. Box 1118
Detroit, Michigan 4823 1
Attention: Mr. M. W. Dawley
Subject: Amendment ”A ” Additional Work to Proposal
CCSD-HG-123 for Aerodynamic Analysis and Wind
Tunnel Testing of Automobiles
Reference: 1. Chrysler-Huntsville Proposal CCSD-HG-123
dated April 11, 1968
2. IPA, HU-1 SUPP 20A, IPR 244418
3. Chrys ler Detroit Air Conditioning & Aerodynamic
Lab R qu est for Additional Work
Gentlemen:
In response to Reference 3, Chrysler Space Division,
Huntsville Operations, submits herewith three (3) copies of the subject amend
ment "A” for performing additional work to the Reference 1 program.
Wind Tunnel Tests of a 3/8 scale ”F” series Plymouth are re
quired in support of the Race Car Program. Proposed additional work is as
follows:
a. Supervision and planning of the 3/8 scale model fabrication.
b. Planning of the test program.
c. Conduct wind tunnel test at University of Wichita.
d. Generate final report of test results.
Our Amendment ’’A” for additional work is submitted on a fixed-
price basis in the amount of $11,495. Reference attached IPA Form HU-1,
SUPP 24 for cost breakdown.
Period of performance will be three (3) months after receipt of
C T Q o ahead.
Oequiies
Excellence HUNTSVILLE, ALABAMA
35807