Page 5 - Combined_97_OCR
P. 5
IH. Operation Plan
A. Separate Burden Center:
CHO will staff the Operation Center with off-site operating personnel
and collect costs under a separate Plant 7804 Burden Center.
W * Staffing;
CHO will staff the operation initially with the following types of
personnel;
Code 19 Supervisor
Code 20 Senior Engineers
Code 25 Engineer B
Code 25 Project Technicians
Code 27 Field Technician General
C. Facilities and Equipment:
The Chrysler Engineering Office-Highland Park will lease the basic
facility and provide a suitable working area for vehicle operation.
Equipment, tools, and supplies required for operation and maintenance
will be purchased or transferred from the Chrysler-Detroit Woodward Garage function.
D. Support Services;
Additional specialized services will be purchased from CHO or local
sources as required to include:
Engineering (Mechanical and Electrical)
K) Fabrication (Electrical and Sheet-metal)
C a S Machine Shop