IH. Operation Plan

                           A. Separate Burden Center:


                                 CHO will staff the Operation Center with off-site operating personnel
                   and collect costs under a separate Plant 7804 Burden Center.

                            W     *  Staffing;


                                 CHO will staff the operation initially with the following types of
                   personnel;

                                        Code 19 Supervisor
                                        Code 20 Senior Engineers
                                        Code 25 Engineer B
                                        Code 25 Project Technicians
                                        Code 27 Field Technician General

                           C.    Facilities and Equipment:


                                 The Chrysler Engineering Office-Highland Park will lease the basic
                   facility and provide a suitable working area for vehicle operation.

                                 Equipment, tools, and supplies required for operation and maintenance
                   will be purchased or transferred from the Chrysler-Detroit Woodward Garage function.

                           D.    Support Services;


                                 Additional specialized services will be purchased from CHO or local
                   sources as required to include:


                                        Engineering (Mechanical and Electrical)
                                  K)    Fabrication (Electrical and Sheet-metal)
                                  C a S   Machine Shop