III.    Operation Plan


                           A.    Separate Burden Center:

                                . CHO will staff the Operation Center with off-site operating personnel
                   and collect costs under a separate Plant 7804 Burden Center.

                           B.    Staffing:


                                  CHO will staff the operation initially with the following types of
                   personnel:


                                  (1)   Code  19 Supervisor
                                  (2)   Code  20 Senior Engineers
                                  (1)   Code  25 Engineer B
                                  (3)   Code 25 Project Technicians
                                  (1)   Code  27 Field Technician  General

                           C.     Facilities and Equipment:


                                  The Chrysler Engineering Office-Highland Park will lease the basic
                   facility and provide a suitable working area for vehicle operation.

                                  Equipment, tools, and supplies required for operation and maintenance
                   will be purchased or transferred from the Chrysler-Detroit Woodward Garage function.

                           D.     Support Services:


                                  Additional specialized services will be purchased from CHO or local
                   sources as required to include:

                                  1.   Engineering (Mechanical and Electrical)
                                  2.    Fabrication (Electrical and Sheet-metal)
                                  3.    Machine Shop