Page 2 - Combined_63_OCR
P. 2
2. Track testing using a magnetic tape recorder capable of recording
large number of analog signals as outlined in our present IPA
work scope. A Brush pen recorder would be used for on the
spot playback and visual readout.
3. Track testing using an on-board telemetry system transmitting to
a receiving station in the pit area with appropriate visual readout
and recording systems.
3. Telemetry Demonstration System
The proposed PCM telemetry demonstration system vehicle was discussed with
Mr. N. March and Mr. R. Clements as well as Mr. Bruns. All are extremely interested
however, Mr. March who should have primary interest will not fund us to perform the
demonstration. Mr. Clements feels very strongly in favor of, but has no funds. Mr.
Bruns feels a telemetry system would benefit the Proving Ground most and should be
funded by Mr. March.
4. Critical Fastener Torque Verification Tool
The engineering model of the torque verification tool was hand carried to the
Dodge Assembly Plant and demonstrated to Mr. R. Mosher and A. Janisz using a dial
indicator type manual torque wrench.
They were favorably impressed with the accuracy and repeatability of the device
and wished to retain it for further testing. Mr. Mosher asked for cost estimates for
design and build-up of several engineering models using different concepts to reduce
weight, size and provide more flexibility with adequate durability.
2