WORK ORDER
          61 201 MAR. 62.                                                                      SHE ET   1__ O F   *______
          CHRYSLER CORPORATION                                                                 R E V1SI ON____________________
                                      DEPARTMENT OFFICE____ ________________ DATE_^ZlA/A§_
           PACE DIVISION                                                                       ROUTING NO
          TITLE Proposal: Wind Tunnel Testing of Scale E.odel Automobile
             COMPONENT                       DIRECT COST             ESTIMATED DATE    CHARGE
                           Direct Labor                                                NUMBER
                 RESPONSI­
            NO.    BILITY  (Man-Hours )  MATERIAL      OTHER       START      FINISH   PROGRAM NO.
                                                                                          (CODE)                 ( )
           480     LEAD     200       $            $            2-16-68 3-31-68
           460   SUPPORT     20                                 3-20-68 3-31-68        WORK DIR. NO.
                 SUPPORT                                                               CONTRACT     PT.  SEC.  P/P  F.O.  T. A. D.
                 SUPPORT
                 SUPPORT
                                                                                         ACTION             DATE
                 SUPPORT                                                               RECEIVED BY
                                                                                       COST ACCOUNTING
                 SUPPORT                                                               BRANCH
                                                                                       CHARGE NO.
                 SUPPORT
                                                                                       ASSIGNED AND
                 SUPPORT                                                               ISSUED
                                                                                       SENT TO DATA
                 SUPPORT                                                               PROCESSING
                                                                                       DEPT.
                 SUPPORT
                                                                                      CLOSED
                 SUPPORT
             TOTALS         220       s            s                                  CONTROL NO.
                         MONTH
                                  Feb. Mar.
          PROJECTED
             WORK      TOT. M. HRS.   72  148
             LOAD      DIR. LABOR
                       LEAD COMP.
                                    72    128
                       M. HRS. D. L.
          DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
          SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
                 (WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION O* THE END PRODUCTS (S), IF ANY; RELEASE' AND DELIVERY DATES! A BRIEF DE­
                  SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S). IF PRACTICABLE! ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
                  DESCRIPTION OF THE WORK INVOLVED).
                                                              PROJECT ENGINEER: W. P. Wright
                                                              LEAD ENGINEER:               J. E. Vaughn



                     Prepare a proposal to the Fluid Mechanics Laboratory at Chrysler Central
           Engineering for the aerodynamic testing of 3/8 scale model automobiles in subsonic
           wind tunnels. The proposal will include studies of available wind tunnels, design of
            segmented automobile models for testing, test planning and instrumentation of models,
           analysis and evaluation of data and preparation of illustrated handbook reports for use
           by Central Engineering and Styling.


                    Scheduled completion date for final proposal is 31 March 1768.



            Overtime: None required










                                            -APPROVED:                                              APPROVED:
           LEAD COMPONENT                          PROGRAM CONTROL & CONTRACT ADMIN.          COST ACCOUNTING BRANCH

           ENGINEERING DEPT. PROGRAM CONTROL STAFF  DIV. COMP.                      DATE

           LEAD DEPARTMENT                         OTHER
                                                   ■


                                                   LEAD COMPONENT
   1   2   3   4