Page 4 - Combined_143_OCR
P. 4

H. P. Bruns                                 -4 -                          January 13, 1970



                          IV. Special Systems Development


                                  a. Driver Seat Suspension System

                                        A Bostrom truck seat is being modified with interchangeable flat
                  torsion springs of varying rates and a hydraulic shock absorber to reduce driver
                 vibration frequency to approximately 1 cps and thereby reduce fatigue and increase
                  performance during long races.


                                  b. Vehicle Thermal Isolation


                                        A lightweight sprayed foamed-in-place polyurethane insulation is
                 being investigated for thermal protection for vehicle interiors to reduce heat inputs to
                  driver and improve fatigue resistance.

                 B.       Plans For Next Month - January 1970 -


                          I.      Test Vehicle Operations

                                  The Charger Daytona will be prepared and tested at Talladega 5-10
                 January 1970 with two experimental engine configurations with several combinations
                  of exhaust systems and carburation.

                                  The test car will then be rebuilt for the next test series.


                                  Time permitting rebuild of second (backup) test car 046 will begin to
                 update it to Daytona sheet metal.


                          II.     Instrumentation and Electronics Support

                                  a. Test Support


                                        The Daytona test car will be instrumented for oval track tests at
                 Talladega. Additional measurements for carburetor inlet air temperature and engine
                 torque will be made.


                                        Preparations will begin to instrument a dra car early in February.
                                                                                        C JQ
                                  b. Communication System


                                        The pit to driver radio system will be prepared with appropriate
                 helmet modifications and installed in Dan Gurneys car for the Riverside raceo
   1   2   3   4   5   6   7