Page 1 - Combined_62_OCR
P. 1

VVUKK UKUtK
          CHRYSLER CORPORATION                                                                   REVISION               __
          SPACE DIVISION               DEPARTMENT OFFICE _„5&M               DATE 12/30/70
                                                                                                 ROUTING NO     ......................

          TITLE Race Car Measuring System Operation Support to CEO-HP
             COMPONENT                        DIRECT COST             ESTIMATED DATE     CHARGE
                           Direct Labor  r                                                               S3‘3 / o
                  RESPONSE                                                               NUMBER
             NO.           ( Man-Hours )  MATERIAL      OTHER        START   '   FINISH
                   BILITV
                                                                            j            PROGRAM NO.   ■
            48      LEAD               s 0, 606     s 2.600       1 Jan. '71 31 Dec. ’7     (CODE!                  ( )
            45    SUPPORT   .1,671        3 cod                                          WORK DIR. NO.  -5T9 L>
                  SUPPORT  ___________                                                   CONTRACT     PT.  SEC.  P P  F.O.  T.A D
                                                                                   *
                  SUPPORT
                  SUPPORT                             •
                                                                                           ACTION             DATE
                  SUPPORT
                                                                                         RECEIVED BY
                                                                                        COST ACCOUNTING
                  SUPPORT                                                                BRANCH
                  SUPPORT                                                                CHARGE NO.
                                                                                         ASSIGNED AND
                  SUPPORT                                                                ISSUED
                                                                                        SENT TO DATA
                  SUPPORT                                                               PROCESSING
                                                                                        DEPT.
                  SUPPORT                                                                               1,1........... ■" ; '•*>
                  SUPPORT                2c o-e                                         CLOSED
             TOTALS         1.671      s            s 2,600                             CONTROL NO.
                         MONTH
                                   Jan.    Feb.   Mar. Apr.     May    June    July   Aug.   Sept.   Oct.   Nov.    Dec.
           PROJECTED
             WORK      TOT. M. HRS.
              LOAD     DIR. LABOR  151    151     151     151    151    151    151     151    151     151    151      10
                       LEAD COMP.
                       M. HRS. D. L.
          DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
          SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
                  (WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Oc THE END PRODUCTS(S), IF ANY; RELEASE AND DELIVERY DATES! A BRIEF DE­
                  SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
                  DESCRIPTION OF THE WORK INVOLVED).
                                                                     Lead Engineer: W. P. Wright


                   Provide measuring systems support to drag car tests and Grand National Car tests as
            required by Engineering Office (H. P. Bruns). Tests are to be conducted at remote sites and
            instrumentation system must be carried to the test site and installed in test vehicle, checked out
            and operated during high speed testing. Data recorded on magnetic tapes must be reduced to
            permanent visual record after each test series. Measuring instrumentation components are to
            be recalibrated to secondary standards after each major test. Portable test systems will be
            used for on-site calibration as required.


                  A Brush model MK260 will be purchased for recording playback of magnetic tapes and
            making hard copies.

                   Overtime (approximately 15%) required during tests.
                                                             o’0
                  Total expenditure not to exceed S-Ui^Loo without prior approval of Engineering

            Comptrollers Chrysler Engineering Office - Highland Park.






                                                                               —
                                                                                                      APPROVED;
           LEAD COMPONENT                                            Ji CONTRACT ADMIN.         COST ACCOUNTING BRANCH

           ENGINEERING DEPT. PROGRAM CONTROL STAFF                 |                 DATE

                                                    OTHER

                                                  COST ACCOUNTING BRANCH
   1