VVUKK UKUtK
CHRYSLER CORPORATION REVISION __
SPACE DIVISION DEPARTMENT OFFICE _„5&M DATE 12/30/70
ROUTING NO ......................
TITLE Race Car Measuring System Operation Support to CEO-HP
COMPONENT DIRECT COST ESTIMATED DATE CHARGE
Direct Labor r S3‘3 / o
RESPONSE NUMBER
NO. ( Man-Hours ) MATERIAL OTHER START ' FINISH
BILITV
j PROGRAM NO. ■
48 LEAD s 0, 606 s 2.600 1 Jan. '71 31 Dec. ’7 (CODE! ( )
45 SUPPORT .1,671 3 cod WORK DIR. NO. -5T9 L>
SUPPORT ___________ CONTRACT PT. SEC. P P F.O. T.A D
*
SUPPORT
SUPPORT •
ACTION DATE
SUPPORT
RECEIVED BY
COST ACCOUNTING
SUPPORT BRANCH
SUPPORT CHARGE NO.
ASSIGNED AND
SUPPORT ISSUED
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT 1,1........... ■" ; '•*>
SUPPORT 2c o-e CLOSED
TOTALS 1.671 s s 2,600 CONTROL NO.
MONTH
Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
PROJECTED
WORK TOT. M. HRS.
LOAD DIR. LABOR 151 151 151 151 151 151 151 151 151 151 151 10
LEAD COMP.
M. HRS. D. L.
DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Oc THE END PRODUCTS(S), IF ANY; RELEASE AND DELIVERY DATES! A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED).
Lead Engineer: W. P. Wright
Provide measuring systems support to drag car tests and Grand National Car tests as
required by Engineering Office (H. P. Bruns). Tests are to be conducted at remote sites and
instrumentation system must be carried to the test site and installed in test vehicle, checked out
and operated during high speed testing. Data recorded on magnetic tapes must be reduced to
permanent visual record after each test series. Measuring instrumentation components are to
be recalibrated to secondary standards after each major test. Portable test systems will be
used for on-site calibration as required.
A Brush model MK260 will be purchased for recording playback of magnetic tapes and
making hard copies.
Overtime (approximately 15%) required during tests.
o’0
Total expenditure not to exceed S-Ui^Loo without prior approval of Engineering
Comptrollers Chrysler Engineering Office - Highland Park.
—
APPROVED;
LEAD COMPONENT Ji CONTRACT ADMIN. COST ACCOUNTING BRANCH
ENGINEERING DEPT. PROGRAM CONTROL STAFF | DATE
OTHER
COST ACCOUNTING BRANCH