Page 2 - Combined_96_OCR
P. 2

Exhibit ”A"
                                                                                          Page 1 of 2
                                                                                          CCSD-HH-465





                                               CIRCUIT RACING VEHICLE


                                                  OPERATIONS CENTER





                         Scope of V/ork

                         The Center will support the Chrysler Engineering Office-Highland Park
                 Circuit Racing Group efforts in the preparation of engineering test model vehicles
                 for track performance testing. Instrumeutation will be installed and checked out
                 at the Center in preparation for track tests. The engineering test car and all sup­
                 port equipment vzill be transported to test sites or major circuit racing tracks for
                 developmental tests.

                         The mobile race control system containing the computerized race scoring
                 system will be maintained and operated from the Huntsville Center. The Mobile
                 Control System (self-contained in a Dodge Mobile Home) will be moved to Super-
                 Speedway races for control operations, scoring, and communications. Also, the
                 Mobile Control System vzill be used for housing instrumentation systems and sup­
                 port services for special track tests.


                         Circuit racing super-speedway cars will be prepared and modified for test­
                 ing at the Center. Engine, drivo train, suspension, and sheet-metal modifications
                 will be made to match test requirements and track conditions.


                         The Chrysler Engineering Office-Highland Park will provide basic require­
                 ments for vehicle preparation and buildup of vehicle systems oi' components.



                          Operation. Plan

                           >      Separate Burden Center


                                  CHO will staff the Operation Center with off-site operating personnel
                 and collect costs under a separate Plant 7804 Burden Center.
   1   2   3   4   5