P. 1

INTER COMPANY CORRESPONDENCE
                                                                       .-■Tj
                                                                                FILE                DATE
                                                                                CODE
      TO - NAME                                                        DIVISION                PLANT/OFFICE
                                          DEPT    Special
                   H. P. Bruns                Vehicle Development        Engineering Office          Highland Park
         •M - NAME                                                     DIVISION
                                          DEPT    Huntsville                                   PLANT/OFFICE
                   W. P. Wright                Race Operations           Engineering Office          Huntsville
      SUBJECT:
                   Projects Currently Under Active Developir ent or Requested for Development
                   by Huntsville Race Operations____________________________________________*_








                   The following projects are under various stages of development by Huntsville Race
                   Operations. This list continues to grow as requests are received from the various
                   Race Group supervisors. We have attempted to place a priority on each project
                   based upon its need and the relationship to the overall program. This priority may
                   or may not be optimum. However, as our manpower and time are limited, we must
                   try to schedule projects very carefully.

                   First priority is of course our regular support of NASCAR and Drag Test activities,
                   however, due to the lull in NASCAR type tests our instrumentation people have had
                   some time to devote to new projects. The most important it is felt for the total pro­
                   gram is the buildup of the printed circuit board signal conditioning and power supply
                   system. This system will save time and money during operation as well as provide
                   a more flexible measurement base system for future growth.


                   If you or any of the Race Group Supervisors have any items to add to this list, I
                   would like to receive them and establish priorities for each project based on the
                   overall schedule and requirement.

                   INSTRUMENTATION DEVELOPMENT PROJECTS:


                   NASCAR

                          1.    Fuel Flowmeters for Race Car or Tank Level or Quantity Gauge


                          2.    Engine Oil System Levels

                                       Right Valve Cover Level
                                       Oil Line Flow
                                       Sump Tank Level (prototype bench calibrate)

                          3.    Exhaust Gas Temperature (partial system prototype tested)


                          4.    Propellor Shaft Speed

                          5.    Tire Temperature


                                       Goodyear System basis



        84- 110-7879 REV, 1-63