WORK ORDER
61201 MAR. 62. SHEET £____ OF
CHRYSLER CORPORATION REVISION 1____________
DEPARTMENT OFFICE S&LI .DATE lO/o/SO-
SPACE DIVISION ROUTING NO
title Circuit Racing Vehicle Operations
COMPONENT DIRECT COST ESTIMATED DATE CHARGE 3'S^SO
Direct Labor
RESPONSI
NO. ( Man-Hours ) MATERIAL OTHER START FINISH
BILITY PROGRAM NO.
4190 LEAD 11,409 S 77,366 S 10/ /69 10/ /70 (CODE) ( )
TraveJl 16,800 WORK DIR. NO.
SUPPORT
Janitor & Util 6,600 CONTRACT PT. SEC. P/P F.O. T.A.D.
SUPPORT
Tools & Equip 3,600
SUPPORT
OT Prem 2,627
SUPPORT
ACTION DATE
Relocation 4.000
SUPPORT RECEIVED 3Y
SUPPORT Mis C 31.200 COST ACCOUNTING
BRANCH
CHARGE NO.
SUPPORT
ASSIGNED AND
ISSUED
SUPPORT
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT
CLOSED
SUPPORT
TOTALS 11,409 s 77,366 s 64,827 CONTROL NO.
Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept.
MONTH
PROJECTED
WORK TOT. M. HRS. 909 950 950 950 950 975 975 975 975 975 950 875
LOAD DIR. LABOR
LEAD COMP.
M. HRS. D. L.
DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION O^ THE END PRODUCTS (S). IF ANY! RELEASE' AND DELIVERY DATES! A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S). IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED).
PROGRAM MANAGER: W. P. Wright
The Cents will support the Chryslei* Engineering Office-Highland Park Circuit1 Racing Group
efforts in the pr eparation of engineering test model vehicles foi- track performance testing,
Instrumentation will be installed and checked out at the Center in preparation for track tests.
The engineering test car and all support equipment will be transported to test sites or major
circuit racing tracks for developmental tests.
The mobile race control system containing the computerized race scoring system will be
maintained and operated from the Huntsville Center. The Mobile Control System (self-con
tained in a Dodge Mobile Home) will be moved to Super-Speedway races for control operations,
scoring, and communications. Also, the biobile Control System will be used for housing
instrumentation systems and support services for special track tests.
\
Circuit racing super-speedway cars will be prepared and modified for testing at the Center.
Engine, drive train, suspension, and sheet-metal modifications vzill be made to match test
requirements and track conditions.
The Chrysler Engineering Oftice-Highland Park will provide basic requirements for vehicl o
preparation and buildup of hide systems or components.
APPROVED: APPROVED:
LEAD COMPONENT PROGRAM CONTROL 8c CONTRACT ADMIN. COST ACCOUNTING BRANCH
ENGINEERING DEPT. PROGRAM CONTROL STAFF DIV. COMP. DATE
LEAD DEPARTMENT OTHER
i--------------------------i—.--------------------------------------------
LEAD DEPARTMENT 3 <7