WORK ORDER
         61201 MAR. 62.                                                                        SHEET     £____ OF
         CHRYSLER CORPORATION                                                                  REVISION       1____________
                                      DEPARTMENT OFFICE        S&LI        .DATE   lO/o/SO-
         SPACE DIVISION                                                                        ROUTING NO
         title             Circuit Racing Vehicle Operations
             COMPONENT                       DIRECT COST             ESTIMATED DATE    CHARGE         3'S^SO
                          Direct Labor
                 RESPONSI­
            NO.            ( Man-Hours )  MATERIAL     OTHER       START      FINISH
                  BILITY                                                               PROGRAM NO.
          4190     LEAD    11,409     S 77,366     S             10/ /69 10/ /70          (CODE)                  ( )
                                             TraveJl    16,800                         WORK DIR. NO.
                 SUPPORT
                                      Janitor & Util     6,600                         CONTRACT     PT.  SEC.  P/P  F.O.  T.A.D.
                 SUPPORT
                                     Tools & Equip       3,600
                 SUPPORT
                                          OT Prem        2,627
                 SUPPORT
                                                                                         ACTION              DATE
                                        Relocation       4.000
                 SUPPORT                                                               RECEIVED 3Y
                 SUPPORT                      Mis C     31.200                         COST ACCOUNTING
                                                                                       BRANCH
                                                                                       CHARGE NO.
                 SUPPORT
                                                                                       ASSIGNED AND
                                                                                       ISSUED
                 SUPPORT
                                                                                       SENT TO DATA
                 SUPPORT                                                               PROCESSING
                                                                                       DEPT.
                 SUPPORT
                                                                                       CLOSED
                 SUPPORT
            TOTALS         11,409     s 77,366     s 64,827                            CONTROL NO.
                                  Oct.    Nov. Dec. Jan. Feb.          Mar. Apr. May June July Aug.               Sept.
                         MONTH
          PROJECTED
             WORK      TOT. M. HRS.   909  950   950    950    950     975    975     975    975    975   950     875
             LOAD      DIR. LABOR
                       LEAD COMP.
                       M. HRS. D. L.
          DESCRIPTION- A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
         SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
                 (WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION O^ THE END PRODUCTS (S). IF ANY! RELEASE' AND DELIVERY DATES! A BRIEF DE­
                  SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S). IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
                  DESCRIPTION OF THE WORK INVOLVED).
                                                                     PROGRAM MANAGER: W. P. Wright
          The Cents will support the Chryslei* Engineering Office-Highland Park Circuit1 Racing Group
          efforts in the pr eparation of engineering test model vehicles foi- track performance testing,
          Instrumentation   will be installed and checked out at the Center in preparation for track tests.
          The engineering test car and all support equipment will be transported to test sites or major
          circuit racing tracks for developmental tests.


          The mobile race control system containing the computerized race scoring system will be
          maintained and operated from the Huntsville Center. The Mobile Control System (self-con­
          tained in a Dodge Mobile Home) will be moved to Super-Speedway races for control operations,
          scoring, and communications. Also, the biobile Control System will be used for housing
          instrumentation systems and support services for special track tests.
                                                                                                \
          Circuit racing super-speedway cars will be prepared and modified for testing at the Center.
          Engine, drive train, suspension, and sheet-metal modifications vzill be made to match test
          requirements and track conditions.

          The Chrysler Engineering      Oftice-Highland Park will provide basic requirements for vehicl  o
          preparation and buildup of      hide systems or components.


                                             APPROVED:                                               APPROVED:
           LEAD COMPONENT                          PROGRAM CONTROL 8c CONTRACT ADMIN.          COST ACCOUNTING BRANCH

           ENGINEERING DEPT. PROGRAM CONTROL STAFF  DIV. COMP.                      DATE

           LEAD DEPARTMENT                         OTHER
                                                                                            i--------------------------i—.--------------------------------------------
                                                     LEAD DEPARTMENT  3 <7