WORK ORDER SHE ET___ * O F *
6^0, MAR. 62.
CHRYSLER CORPORATION . , R E VISIO N
SPACE DIVISION DEPARTMENT OFFICE— _________ DATE ROUTING NO
TITLE Scelc cd/1 Wind Tunnel JL^Ung of /■ utcmobile
COMPONENT DIRECT COST ESTIMATED DATE CHARGE
Direct Labor NUMBER 5516)
RESPONSI
NO. (Man-Hours ) MATERIAL fravel START FINISH
BILITY PROGRAM NO.
4800 LEAD 568 s s 1741 4/22/68 7/31/68 (CODE) ( )
WORK DIR. NO.
SUPPORT
SUPPORT CONTRACT PT. SEC. P/P F.O. T.A.D.
SUPPORT
SUPPORT
ACTION DATE
SUPPORT RECEIVED BY
COST ACCOUNTING
SUPPORT BRANCH
SUPPORT CHARGE NO.
ASSIGNED AND
SUPPORT ISSUED
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT
CLOSED
SUPPORT
TOTALS 56a S s 171 CONTROL NO.
MONTH Apr May June July
PROJECTED
WORK TOT. M. HRS. 56 168 168 176 568
LOAD DIR. LABOR
LEAD COMP.
56 168 168 176
M. HRS. D. L.
DESCRIPTION: A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION O^ THE END PRODUCTS (S). IF ANY: RELEASE AND DELIVERY DATES! A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE; ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED) .
PROJECT £ ICI4E.IR: W. p. Wright LEAD ENGIMKEM: J* E. Vaughn
Provide Aerodynamic Support to the Fluid Lechamc^ end Aerodynamic# .Laboratory
of the Engineering Office in a /■land Park in the following technical areas:
I. Test Planning 3/8 scale testing
/.;odel configuration
. odel fabrication coordination
Wind Tunnel interface coordination
Test Conduction
Data Analysi
APPROVED: APPROVED:
LEAD COMPONENT PROGRAM CONTROL & CONTRACT ADMIN. COST ACCOUNTING BRANCH
ENGINEERING DEPT. PROGRAM CONTROL STAFF DIV. COMP. DATE
LEAD DEPARTMENT OTHER