P. 1
C
■ • • . . . . '.
i-iLE i DATE
CODE ! March <4* 1968
TO - HAME DEPT, DlViSJON fLANT/OFFICE
24* Ik Dawley 3860 Engineering Office Highland Park
FROM ■■ NAME DEPT. DIVISION PLANT/OFFicE
Fv 'W* Beady 3860 Engineering Office Highland Park
Px^oposed E^R/W Wind...Tunnel,Tests
Outlined below are three wind tunnel test programs proposed for ’*EW Series
B-Body race vehicles* The estimated material cost and man hour requirements of
Department 3860 are detailed along with a brief description of the tests
that would be conducted under each program*
At least 6 weeks of tunnel time will be involved in which the 1st 2 weeks
will be utilized in ground plan& adjustments, securing basic drag ratings
and setting up instrumentation on each lof the three models* The third
week will, be needed to make blockage correction studies needed as a basis
for better interpretation of yawed .model performance in terms of road
behavioro The remaining 3 weeks will be used for various model
changes and the determination of the performance factors associated with
them- It is anticipated that these tests will be conducted during July
and August with a test report to follow in Septembero The list of things
to be considered includes:
spoilers - reax- deck, front undex*body5 etc*
front end modifications
greenhouse and roof mod x fications
vehicle attitude
wheel house opening J (X
surface pressures
etc*
Equipment Required; 1* (1J base test model ■■•ith interchangeable EM23,.
EW-23 and Bk-29 front ends and greenhouses
Cost £-20,000
2* (1J ground board - new ground board with
trailing edge flap for stagnation
point adjustment
Cost Si.000
3o (6) weeks of wind tunnel rental - .Wichita State
University
Cost 115-000