WORK ORDER
61201 MAR. 62. SHEET
CHRYSLER CORPORATION REVISION
PACE DIVISION DATE— 10/6/69 ROUTING NO.
TITLE Circuit Racing Vehicle
COMPONENT DIRECT COST ESTIMATED DATE CHARGE ysaso
Direct Labor NUMBER
NO. RESPONSI ( Man-Hours ) MATERIAL OTHER START FINISH
BILITY PROGRAM NO.
4190 LEAD 11,409 $ 77,366 $ 10/ /69 10/ /70 (CODE) ( )
SUPPORT Travesi 16.800 WORK DIR. NO.
SUPPORT Janitor &Ut il 6.600 CONTRACT FT. SEC. P/P F.O. T. A.D.
SUPPORT Tools & Equip 3,600
SUPPORT OT Pre:n 2,627
jSir'T|r»N
SUPPORT Relocationn 4.000 RECEIVED BY
COST ACCOUNTING
SUPPORT Mis-8 31,200 BRANCH
CHARGE NO.
SUPPORT
ASSIGNED AND
SUPPORT ISSUED
SENT TO DATA
SUPPORT PROCESSING
DEPT.
SUPPORT
CLOSED
SUPPORT
TOTALS 11,409 $ 77,366 s 64,827 CONTROL NO.
MONTH
Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept.
PROJECTED
WORK TOT. M. HRS. 9019 950 950 950 950 975 975 975 975 975 950 875
LOAD DIR. LABOR
LEAD COMP.
M. HRS. D. L.
DESCRIPTION: A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION O* THE END PRODUCTS (S), IF ANY! RELEASE' AND DELIVERY DATES! A BRIEF DE
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S), IF PRACTICABLE! ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED).
PROGRAM MANAGER: W. P. Wright
The Center will support the Chrysler Engineering Office-Highland Park Circuit5 Racing Group
efforts in the preparation of engineering test model vehicles for track performance testing.
Instrumentation will be installed and checked out at the Center in preparation for track tests.
The engineering test car and all support equipment will be transported to test sites or major
circuit racing tracks for developmental tests.
The mobile race control system containing the computerized race scoring system will be
maintained and operated from the Huntsville Center. The Mobile Control System (self-con
tained in a Dodge Mobile Home) will be moved to Super-Speedway races for control operations,
scoring, and communications. Also, the Mobile Control System will be used for housing
instrumentation systems and support services for special track tests.
A
Circuit racing super-speedway cars will be prepared and modified for testing at the Center.
Engine, drive train, suspension, and sheet-metal modifications will be made to match test
requirements and track conditions.
The Chrysler Engineering Office-Highland Park will provide basic requirements for vehicle
preparation and buildup of vehicle systems or components.
APPROVED: APPROVED:
LEAD COMPONENT PROGRAM CONTROL 8c CONTRACT ADMIN. COST ACCOUNTING BRANCH
ENGINEERING DEPT. PROGRAM CONTROL STAFF DIV. COMP. DATE
LEAD DEPARTMENT OTHER
LEAD DEPARTMENT