WORK ORDER
CHRYSLER CORF :,on REVISION
SPACE DIVISION DEPARTMENT OFFICE S&M. DATE 1D/6Z&9_ ROUTING NO
TITLE Circuit Vehicle Operations //
COMPONENT DIRECT COST ESTIMATED DATE CHARGE
Direct Labor
RESPONSI- NUM BER • T
NO. (Man-Hours ) MATERIAL OTHER START FINISH
BILITY PROGRAM NO.
4190 LEAD 11.409 s 10/ /69 10/ /70 (CODE) ( >
TraveH 16,800 WORK DIR. NO.
SUPPORT ------- z------
SUPPORT Janitor & Util 6,600 CONTRACT PT. SEC. p/p F.O. T.A.D.
Tools & Ecfuip '■
SUPPORT 3,600
SUPPORT OT Prem 2,627
ACTION DATE
SUPPORT Relocation 4.000 RECEIVED BY
SUPPORT Mis 3 31.200 COST ACCOUNTING A?'23 -69
BRANCH
SUPPORT CHARGE NO.
SUPPORT ISSUED
SENT TO DATA
SUPPORT A' PROCESSING
DEPT.
SUPPORT
SUPPORT // w oc// CLOSED
TOTALS s 64,827 CONTROL NO.
MONTH Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept.
PROJECTED
WORK TOT. M. HRS. 909 950 950 950 950 975 975 975 975 975 950 875
LOAD DIR. LABOR
LEAD COMP.
M. HRS. D. L.
DESCRIPTION: A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
(WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Or THE END PRODUCTS (S) , IF ANY; RELEASE’ AND DELIVERY DATES: A BRIEF D £-
SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S). IF PRACTICABLE: ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
DESCRIPTION OF THE WORK INVOLVED) .
PROGRAM MANAGER: W. P. Wright
* The Center will support the Chrysler Engineering Office-Highland Park Circuit Racing Group
efforts in the preparation of engineering test model vehicles for track performance testing.
Instrumentation will be installed and checked out at the Center in preparation for track tests.
The engineering test car and all support equipment will be transported to test sites or major
circuit racing tracks for developmental tests.
The mobile race control system containing the computerized race scoring system will be
maintained and operated from the Huntsville Center. The Mobile Control System (self-con
tained in a Dodge Mobile Home) will be moved to Super-Speedway races for control operations,
scoring, and communications. Also, the Mobile Control System will be used for housing
instrumentation systems and.support services for special track tests.
■ Circuit racing super-speedway cars will be prepared and modified for testing at the Center.
Engine, drive train, suspension, and sheet-metal modifications will be made to match test
requirements and track conditions.
The Chrysler Engineering Office-Highland Park will provide basic requirements for vehicle
preparation and buildup of vehicle systems or components.
APPROVED: APPROVED:
LEAD COMPONENT PROGRAM CONTROL & dor0ACT ADMIN. COST ACCOUNTING BRANCH
.Hi
ENGINEERING DEPT. PROGRAM CONTROL STAFF DIV. COMP. DATE
/A! \
-.............\....... ... . ’ ... ■ . ... ...
LEAD DEPARTMENT A )
COST ACCOUNTING BRANCH