                                                       WORK ORDER
         CHRYSLER CORF         :,on                                                            REVISION
         SPACE DIVISION              DEPARTMENT OFFICE         S&M.        DATE    1D/6Z&9_    ROUTING NO
         TITLE            Circuit          Vehicle Operations           //
            COMPONENT                        DIRECT COST            ESTIMATED DATE     CHARGE
                          Direct Labor
                RESPONSI-                                                              NUM BER                • T
            NO.           (Man-Hours )  MATERIAL      OTHER        START      FINISH
                  BILITY                                                               PROGRAM NO.
          4190    LEAD    11.409                   s            10/  /69 10/  /70         (CODE)                  (    >
                                            TraveH     16,800                          WORK DIR. NO.
                 SUPPORT                                                                                            ------- z------
                 SUPPORT             Janitor & Util      6,600                         CONTRACT     PT.  SEC.  p/p  F.O.  T.A.D.
                                     Tools & Ecfuip                              '■
                 SUPPORT                                 3,600
                 SUPPORT                 OT Prem         2,627
                                                                                         ACTION             DATE
                 SUPPORT                Relocation      4.000                          RECEIVED BY
                 SUPPORT                      Mis 3    31.200                          COST ACCOUNTING   A?'23  -69
                                                                                       BRANCH
                 SUPPORT                                                               CHARGE NO.
                 SUPPORT                                                               ISSUED
                                                                                       SENT TO DATA
                 SUPPORT                                  A'                           PROCESSING
                                                                                       DEPT.
                 SUPPORT
                 SUPPORT  // w             oc//                                        CLOSED
            TOTALS                                 s   64,827                          CONTROL NO.
                        MONTH    Oct.     Nov. Dec.     Jan.   Feb.   Mar. Apr.      May    June   July   Aug.    Sept.
          PROJECTED
            WORK      TOT. M. HRS.   909  950    950    950    950    975     975    975    975     975   950     875
             LOAD     DIR. LABOR
                      LEAD COMP.
                      M. HRS. D. L.
         DESCRIPTION: A COMPLETE DESCRIPTION OF THE SCOPE OF WORK OF THE LEAD COMPONENT. THIS DESCRIPTION
         SHOULD BE OF AN UNCLASSIFIED NATURE AND INCLUDE:
                 (WHAT IS TO RESULT FROM THE WORK AND WHEN: A DESCRIPTION Or THE END PRODUCTS (S) , IF ANY; RELEASE’ AND DELIVERY DATES: A BRIEF D £-
                 SCRIPTION OF SUPPORTING SUBSIDIARY WORK ORDER (S). IF PRACTICABLE: ANY OTHER INFORMATION WHICH IS NEEDED TO OBTAIN A COMPLETE
                 DESCRIPTION OF THE WORK INVOLVED) .
                                                                    PROGRAM MANAGER: W. P. Wright

         * The Center will support the Chrysler Engineering Office-Highland Park Circuit Racing Group
          efforts in the preparation of engineering test model vehicles for track performance testing.
          Instrumentation will be installed and checked out at the Center in preparation for track tests.
          The engineering test car and all support equipment will be transported to test sites or major
           circuit racing tracks for developmental tests.


           The mobile race control system containing the computerized race scoring system will be
           maintained and operated from the Huntsville Center. The Mobile Control System (self-con­
          tained in a Dodge Mobile Home) will be moved to Super-Speedway races for control operations,
           scoring, and communications. Also, the Mobile Control System will be used for housing
           instrumentation systems and.support services for special track tests.

        ■ Circuit racing super-speedway cars will be prepared and modified for testing at the Center.
           Engine, drive train, suspension, and sheet-metal modifications will be made to match test
           requirements and track conditions.

           The Chrysler Engineering Office-Highland Park will provide basic requirements for vehicle
           preparation and buildup of vehicle systems or components.


                                            APPROVED:                                               APPROVED:
           LEAD COMPONENT                          PROGRAM CONTROL & dor0ACT ADMIN.            COST ACCOUNTING BRANCH
                                                         .Hi
           ENGINEERING DEPT. PROGRAM CONTROL STAFF  DIV. COMP.                      DATE
                                                             /A! \
          -.............\.......  ... . ’ ... ■ . ... ...
           LEAD DEPARTMENT                                     A )


                                                 COST ACCOUNTING BRANCH
   1